Monthly Goals

September Goals

So, I wasn’t really good at sticking to my goals in August, and I’m not really holding my breathe for this month. With having my mom in country, a lot of craft time is spent on things that are important to her or that she can take back to family. However, that isn’t going to stop me from setting some goals. For the most part, my goals are similiar to the ones from the previous month. I will put a bit more focus on the WIPGO projects. In addition, in terms of months, I consider September, October, and November to be the “Fall” months. So I will be tailoring my season goals towards those months. I’ve decided to make a goal of 1000 stitches per a seasonal goal… HOWEVER, this will be a season long goal, not one that needs to be completed in a single month. If I find that goal isn’t big enough, I will adjust it later in the season. Until then, below are my September goals.

WIPGO Goals:

  • Lantern Lane –  Left Fence and everything below
  • Welcome SAL – First 4 pages
  • Dressmaker’s Daughter – 500 Stitches
  • Epic Disney Princesses – Castle
  • Giant Harry Potter – Top Row of pages
  • One Nation – 15 Stars Complete
  • So Many Books, So Little Time – 500 Stitches
  • Visit Mordor  – 500 Stitches
  • Serengeti Mandala  – All the colors (not black) stitched on the 3 sides of part 2 (1 side is out of reach)
  • Halloween Rules  – Finish two parts
  • Letter to Hogwarts  – Start
  • M.A.P. SAL  – Top border
  • US Presidents  – top row of Presidents & surrounding border
  • Celtic Summer – Small motifs on the border
  • Once Upon a Fairytale Shelf – 500 stitches
  • Advent Animal #2 – finish cross stitching the animal
  • Paris Mandala – Finish the Cross Stitching on Part 1

Seasonal Goals:

  • Autumn Quilt – 1000 Stitches
  • Celtic Autumn – 1000 Stitches
  • Autumn Garden – 1000 Stitches
  • Autumn Queen – 1000 Stitches
  • Fall Celebration – 1000 Stitches
  • September Cottage – 460/1000 Stitches
  • October Cottage – 1000 Stitches
  • November Cottage – 1000 Stitches

Other Craft/Stitching Goals:

  • Scooby Doo Stitching Project for Alex – START AND COMPLETE
    • Turn FO into a pillow
  • Scobby Doo Project Bag for Alex – START AND COMPLETE
  • Make Ornament Exchange Project
  • Sew on Velcro on all Project Bags
  • Make 2 more Knitting Project Bags -1
  • Bella’s Afghan 5 color changes -1/5
  • Bri’s Afghan – finish 2nd set of repeats
  • Dad’s Socks Finished
  • Mumsy’s Socks Finished
  • Beautiful Shells Afghan – Finished (September WIPGO)
  • Liliana Afghan – Finish Part 3 (September WIPGO)

Stretch Non-Stitching WIPGO Goals:

  • Work on Goldberry Shawl for 2 hrs
  • Work on Auntie’s Shawl for 2 hrs
  • Cut out all fabric for Alex’s Quilt
  • 1 round a week on Delft Sophie (5 rounds total)
  • Cast on Halloween Stripey Sock
  • Work for 2 hours on Reyna Shawl
  • Make 2 Christmas Balls
  • Work on Grinda Shawl for 2 hrs
  • 1 round a week on Phoenix Afghan (5 rounds total)
  • Make 5 Washclothes – 1/5
  • 1 repeat a week on the Emiliana Shawl (5 repeats total)